Ross River Dam to Douglas Water Treatment Plant – Pipeline Duplication
PDM provided superintendency and contract administration, with inspection and verification services, for approx. 9.345km of 1290mm OD MSCL pipeline duplication.
Client
Townsville City Council
Sector
Infrastructure & Industry
Phase
Deliver
Townsville · Townsville City Council
Ross River Dam to Douglas Water Treatment Plant Pipeline Duplication required the design and construction of approx. 9.345km of predominantly buried 1290mm OD MSCL Pipeline from Ross River Dam Outlet to the Douglas Water Treatment to provide a duplication of the existing pipeline.
The Project exits the Ross Dam outlet, running along Riverway Drive and connects into and out of the Ross River booster pump station, continues along Riverway Drive then crosses the Ross River (open trench). Runs along the upper east bank of Ross River within the Mount Stuart Training Area traversing approximately 22 watercourses and connects into the Douglas Water Treatment Plant.
The Project has two cross connections from the new MSCL Pipeline to the existing DN1220 concrete pipeline.
The scope of the work comprised:
Superintendency and contract administration of up to three contracts
Inspection and verification of QA/QC, Workplace Health and Safety, Cultural Heritage and Environmental conformance
PDM provided three personnel as Superintendent’s Representative and Clerk of Works (Inspector) for the brownfield installation of a gravity sewer system in Nelly Bay.
PDM’s involvement includes project management and superintendency, along with inspectorial services, for the Recycled Water Treatment Facility and its supporting pipeline.
Talk to the team about your project.
Call the Hermit Park office, email the team or send an enquiry. Accreditation and policies are on the About page.