44 projects for councils, Defence, developers, industry and research across North Queensland and beyond. Filter by sector or service, and open any project to read what PDM did.

Sector
Service

44 projects

  • A street in the Townsville CBD at night, lined with lit poles and shopfronts
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    CBD Utilities Upgrade

    PDM provided the Superintendent’s Representative and inspectorial services for the upgrade of approximately 14.6 km of water and sewer mains in the Townsville CBD.

    Read the project story

    Role: Superintendent’s Representative and Inspectorial Services

    Location: Townsville CBD

    Phase: Deliver

    The Townsville City Council’s water and sewerage infrastructure in the CBD is an ageing asset which is not meeting the serviceability requirements of the community. The objective of the project was to upgrade the existing infrastructure to meet current standards and provide serviceability into 2050.

    The CBD utilities project required the Construction Manager to execute approximately 14.6 km of water and sewer mains whilst maintaining the network functionality of the CBD water and sewer reticulation systems. This required extensive community and stakeholder consultation as a result of the traffic management and network controls required for the construction to occur.

  • Visitors among the tall painted poles of the All Abilities Playground beside the river at Riverway
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    All Abilities Playground – Riverway

    As Townsville City Council’s Client’s Representative, PDM project managed this multi-disciplinary playground designed to challenge and engage children of all abilities.

    Read the project story

    Role: Client’s Representative

    Location: Riverway, Townsville

    Phase: Deliver

    PDM was engaged as Townsville City Council’s Client’s Representative to project manage this multi-disciplinary playground which is designed to challenge and engage children of all abilities.

    The project’s intention was to create a space where children and families come together to explore, imagine, and develop within a recreational environment utilising a range of natural and built elements to encourage all types of play.

    The playground incorporates a number of structures and features which include a two-level viewing platform, pathways and interactive playground equipment for children of all abilities.

    As the Client’s Representative, PDM’s role entailed the management of a landscape architect, as well as civil, structural, and mechanical design engineering consultants.

    The construction aspect of this project was tendered to the open market, whilst the design was refined by the relevant government agencies. This project was the first of its kind in North Queensland, with only six of these facilities having been built across the state.

  • Workers installing large valves and pipework inside the caisson at the Campbell Street Pump Station
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    Campbell Street Pump Station

    PDM undertook the upgrade and management of the Campbell Street Pump Station, converting it from a three to six megalitre capacity pipeline.

    Read the project story

    Role: Project Management & Inspectorial Services

    Location: Townsville

    Phase: Deliver

    As part of the Townsville City Council’s infrastructure program, PDM undertook the upgrade and management of the Campbell Street Pump Station, converting it from a three to six megalitre capacity pipeline.

    Works involved incorporation of an in-situ caisson: a retaining, watertight structure used to work on the foundations. The caisson was constructed such that the water could be pumped out, allowing the working environment to remain dry whilst digging until construction was completed.

    This project involved regular risk-based assessment to control the works being conducted on site, as well as a clear understanding and ability to analyse civil projects, combined with the ability to inspect the works and liaise and communicate with the designers and sub-contractors that Council had engaged.

  • An excavator lowers pipe fittings into a deep, stepped trench on the Northshore sewerage works
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    Northshore Sewerage Pump Station

    PDM managed full-time inspections to monitor quality and safety on a trunk sewerage main and associated pump stations for the Northern Beaches Development.

    Read the project story

    Role: Inspectorial Services

    Location: Northshore, Townsville

    Phase: Deliver

    PDM were engaged on behalf of Townsville City Council for Inspectorial Services to manage works undertaken for the supply and construction of a trunk sewerage main, and associated pump stations for the Northern Beaches Development.

    The works were undertaken by Principal Contractors, with PDM managing full-time inspections to monitor quality and ensure safety standards were maintained.

    Works involved the installation of a twelve-metre precast fibreglass pump station with 1.2 kilometres of 375 degree trunk rising main.

    Due to the nature of the works, site management was paramount. Preventative measures included earthworks being stepped to guarantee site stability and contractor safety when working below ground level in open trenches.

  • An excavator digs a sewer trench along a street at Picnic Bay
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    Picnic Bay Sewerage Upgrade (Stage 1)

    PDM was Superintendent’s Representative and Works Inspector for a gravity sewer main replacing the existing septic sewerage system at Picnic Bay on Magnetic Island.

    Read the project story

    Role: Project Management & Inspectorial Services

    Location: Picnic Bay, Magnetic Island

    Phase: Deliver

    PDM was engaged as the Superintendent’s Representative and Works Inspector for Townsville City Council on the Picnic Bay Sewerage Upgrade. This project involved the construction of a gravity sewer main to replace the existing septic sewerage system at Picnic Bay on Magnetic Island.

    These works involved contract administration and works supervision roles.

    Public liaison on behalf of Council was paramount for this project, with the works undertaken being within close proximity of one hundred residential premises.

    Communication with the Island Service Providers (i.e. public transport companies, taxis, police, and ambulance) was also vital regarding notification and scheduling of works.

  • Concrete-lined flood diversion channel behind temporary fencing at Kelso
    Client
    Thuringowa City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    Kelso Flood Diversion Scheme (Construction Works)

    PDM reviewed the works, extensions of time and variations, then fully administered the contract for a new flood diversion channel approximately one kilometre in length.

    Read the project story

    Role: Superintendent’s Representative

    Location: Kelso, Thuringowa

    Phase: Deliver

    In-house design by Council and management by PDM.

    PDM was engaged by Thuringowa City Council Works Department to review the performance of works undertaken in conjunction with extensions of time and quality of work for this project. Key aspects involved the construction of a new flood diversion channel approximately one kilometre in length in the upper reaches of Kelso, Thuringowa.

    PDM undertook a review of the contract conditions and the works being undertaken to determine if the contract warranted extensions of time and variations under the scope of works.

    The contract was then fully administered by PDM to necessitate timeframes and the claims from the contractor to finality.

  • Rock breakwater, jetty and gangway at the AIMS Cape Ferguson site, with buildings and hills behind
    Client
    Australian Institute of Marine Science
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    AIMS Cape Ferguson

    PDM managed the initiation of this AIMS project, providing Principal professionals to undertake a range of services in developing the project outcomes.

    Read the project story

    Role: Development Manager

    Location: Cape Ferguson, Townsville

    Phase: Deliver

    PDM was engaged by the Australian Institute of Marine Science (AIMS) to manage the initiation of this project by providing Principal professionals to undertake a range of services in developing the project outcomes. These outcomes are driven by climate change response, sustainability, innovation, renewable energy and energy conservation.

    AIMS operate a scientific research and training facility at Cape Ferguson on the southern outskirts of Townsville, North Queensland. The Tropical Marine Research Facilities, Australian Institute of Marine Science (AIMS) Project is an initiative of the Australian Government under the Super Science Initiative. The funding also supports the Government’s economic stimulus package.

    The Project builds on AIMS’ internationally recognised capabilities in marine biodiversity, water quality and ecosystems health, marine microbiology and symbiosis, and impacts and adaption to climate change. AIMS’ mission is “to generate and transfer knowledge to support the sustainable use and protection of the marine environment through innovative, world class scientific and technological research”.

    The Project consists of the following elements:

    • Ocean simulator and seawater enhancements
    • Expanded facilities to support growth in Townsville, including a Tropical Marine Collections Facility
    • Implementation of new technologies to reduce energy consumption
    • A vessel berthing and operations facility in Townsville
    • Darwin Coastal Environmental Research Laboratories Expansion

    AIMS is embarking on the construction of a number of new facilities including:

    • A site-wide District Cooling System incorporating a Central Energy Plant. The Central Energy Plant shall house the site-wide chilled water system incorporating stratified chilled water thermal energy storage for the entire site.
    • North Wing building.
    • Research (ATOS) Facility approx. 3,150m² with nominal 1,350m² of controlled environment requiring air-conditioning.
    • As well as the existing seawater upgraded pumping and water storage and treatment facilities.
    • Second diesel standby generator to support the existing standby generator, both to be wired to the main switchboards to operate in the event of power failure off the main electricity supply from the electricity retailer.
  • Aerial view of the recycled water treatment facility under construction, with two large circular tanks
    Client
    Townsville City Council
    Sector
    Infrastructure & Industry
    Phase
    Deliver

    Cleveland Bay Recycled Water Treatment Facility

    PDM’s involvement includes project management and superintendency, along with inspectorial services, for the Recycled Water Treatment Facility and its supporting pipeline.

  • Aerial view of the Breakwater, Townsville, with the Saltwater development site highlighted in red and Castle Hill behind
    Client
    Matrix North Queensland Pty Ltd
    Sector
    Property Development
    Phase
    Deliver

    Civil Work Packages – Saltwater Development

    PDM provided a Principal Project Manager to manage the sub-contracted civil infrastructure packages for Matrix North Queensland at the Saltwater development.

  • Flinders Mall and the Townsville city centre at dusk, with Castle Hill behind
    Client
    Townsville City Council
    Sector
    Property Development
    Phase
    Deliver

    Flinders Mall Redevelopment

    PDM’s Senior Project Manager was seconded to Townsville City Council as Site Manager, providing project control for the $60 million Flinders Mall Redevelopment.

    Read the project story

    Role: Project Management

    Location: Townsville

    Phase: Deliver

    PDM’s Senior Project Manager was seconded to Townsville City Council in the role of Site Manager to conduct regular risk-based assessment, analyse the progress of the project, undertake site inspections and provide project control for the $60 million Mall Redevelopment.

    The mall redevelopment presented a significant challenge whilst co-ordinating works around a busy, fully operational city business centre.

    This landmark project required PDM’s personnel to work closely with Council to coordinate and confirm all works that the Contractor was undertaking for the completion to schedule.

    The successful redevelopment of the Flinders Mall sees the rebirth of a vibrant, functioning retail and office hub, with PDM playing a significant part in this project.

  • Excavators and a site vehicle on cleared earthworks at a Northern Beaches sub-division
    Client
    Thuringowa City Council, Planning and Development Department
    Sector
    Property Development
    Phase
    Deliver

    Northern Beaches Sub-Division

    As Council’s Representative, PDM inspected multiple sub-divisional works in the Northern Beaches Sub-Division and reported on each development to Council.

    Read the project story

    Role: Council’s Representative

    Location: Northern Beaches, Thuringowa

    Phase: Deliver

    PDM was engaged by Thuringowa City Council as Council’s Representative, to undertake inspections on multiple sub-divisional works in the Northern Beaches Sub-Division – Thuringowa to maintain Council’s due diligence for the construction activities in accordance with Council’s requirements.

    This engagement required PDM to provide a written report on each development to satisfy Council’s Planning and Development departments, that contractors were undertaking construction activities to the standards required by Council, the EPA, and other Government Agencies.

    In the instance where contractors were providing sub-standard works, PDM made recommendations to Council, enabling direction of contractors to meet the necessary standards.

  • View over bushland and houses to the bay at Keswick Island
    Client
    Keswick Developments Pty Ltd
    Sector
    Property Development
    Phase
    Deliver

    Development of approx. 700 Sub-divisional Lots at Keswick Island

    PDM undertook the development, construction and contract management of all infrastructure, services, roads and associated works for housing allotments on Keswick Island.

    Read the project story

    Role: Development, Construction and Contract Management

    Location: Keswick Island, Whitsundays

    Phase: Deliver

    PDM undertook the Development, Construction and Contract Management on behalf of the principal contractor Keswick Developments Pty Ltd for the construction of all infrastructure, services, roads and associated works for the development of privately owned housing allotments on Keswick Island.

    Keswick Island is the southernmost island of the Whitsundays group, approximately 1,400 hectares in area, with approximately 1,000 hectares being national park.

    Environmental management and minimisation of impact was a key consideration during the planning, construction and infrastructure stages of this project, given that the majority of the island is nature reserve.

    PDM actively managed this project to ensure its client’s brief was fully met, whilst minimising any negative environmental concerns associated with construction activities of this proportion.

    The nature of works undertaken in this development included:

    • Approximately 700 housing allotments
    • Upgrade of aerodrome facilities
    • Installation of a new sewerage treatment plant
    • Installation of a new water treatment plant
    • Construction of marina facilities
  • New kerb and set-out pegs along a subdivision street under construction at Oonoonba
    Client
    Urban Land Development Authority
    Sector
    Property Development
    Phase
    Deliver

    Oonoonba Subdivision

    PDM’s Project Inspectors audited the Oonoonba works weekly against the design drawings, client guidelines and budget, also reviewing safety and environmental practices.

    Read the project story

    Role: Inspectorial Services

    Location: Oonoonba

    Phase: Deliver

    PDM was engaged by the Urban Land Development Authority after they identified the need for a third party to undertake an audit of the works on site.

    This project involves the development of multiple housing allotments providing affordable community residential dwellings.

    PDM has provided Project Inspectors to monitor works on a weekly basis to ensure the scope of works is being delivered to the standard of the design drawings, within client guidelines and budget. The weekly inspection of works also reviews safety and environmental practices, in addition to general construction activities.

    Efficient management strategies and regular reporting processes see the project progressing with minimal issues, allowing the client’s scope of works to be delivered without delay to schedule.

  • New roads, footpaths and landscaping at the Riverside Ridge estate in Douglas
    Client
    Glen Alpine Properties Pty Ltd
    Sector
    Property Development
    Phase
    Deliver

    Riverside Ridge Land Development

    PDM provided development management of Glen Alpine Properties’ Riverside Ridge hillside land development in Douglas, incorporating approximately six hundred lots in total.

    Read the project story

    Role: Development Management

    Location: Douglas, Townsville

    Phase: Deliver

    PDM was engaged by Glen Alpine Properties Pty Ltd to provide Development Management of its Riverside Ridge project in Douglas, Townsville, which involved hillside land development to deliver ‘super lots’ to accommodate housing unit developments, incorporating approximately six hundred lots in total.

    The development was delivered in stages, involving the coordination of consultants, design work and staging in accordance with the engagement under each contract.

    Key aspects of PDM’s role throughout this project included:

    • Management of construction works and co-ordination of the design consultants to fulfil contractual obligations.
    • Issue correspondence to the design contracts, in accordance with the performance of the particular contract.
    • Issue recommendations for monthly progress claims for the approval of the principal for payment under the terms of the applicable contracts. Contractor selection and tendering, contractor negotiations.
    • Coordination of operational works permits applications and other agency requirements.
    • Undertook program management including budget forecasting, monthly progress payments, budget versus actual comparison, program delivery, extension of times, program comparisons – contract pc date, current pc date, forecast pc date, variations, approved variations, pending variations.
    • Summary performance of the contracts to date, consultant, contractor selection and management.
    • Liaison with Council on project issues to maintain strong cooperative approach to the delivery of the project, in addition to liaison with other organisations including Department of Natural Resources, Department of Main Roads, Environmental Protection Agency, ERGON, Telstra, Origin Gas.
  • Stone entrance wall and sign at RAAF Base Edinburgh
    Client
    Department of Defence
    Sector
    Aviation & Ports
    Phase
    Deliver
    Year
    2008–2009

    RAAF Base Edinburgh & Woomera Aircraft Pavement Maintenance

    PDM undertook project and construction management for Australian Pavement Maintenance Systems on the 2008–2009 airfields maintenance works package at RAAF Edinburgh & Woomera.

  • Missile display and restricted-entry sign at the entrance to RAAF Base Darwin
    Client
    Department of Defence
    Sector
    Aviation & Ports
    Phase
    Deliver
    Year
    2009–2010

    RAAF Base Darwin Aircraft Pavement Maintenance

    PDM undertook the construction management for Colquhoun Constructions on the 2009–2010 airfields maintenance package for RAAF Base Darwin, Northern Territory.

    Read the project story

    Role: Project Manager & Contract Administration

    Location: Darwin, Northern Territory

    Phase: Deliver

    PDM undertook the Construction Management on behalf of Colquhoun Constructions for the 2009–2010 airfields maintenance package for Royal Australian Air Force (RAAF) Base, Darwin, Northern Territory.

    The works program included pavement rectification, pavement rejuvenation, concrete repairs and joint replacement works whilst under an active military and civilian aviation environment.

    The project was resourced and managed from Townsville and required a team of approximately twelve men mobilised to Darwin.

    Logistical challenges included managing and maintaining work schedules around military activity and adhering to Department of Defence security requirements.

  • Aerial view of the Ingham Aerodrome runway
    Client
    Hinchinbrook Shire Council
    Sector
    Aviation & Ports
    Phase
    Deliver

    Ingham Aerodrome – Pavement Refurbishment

    PDM prepared a summary report on the pavement condition of the Ingham Aerodrome, then undertook the project management for its pavement refurbishment.

  • Defence sign for the Greenvale Training Area beside an unsealed road, marked “Road closed – permit holders only”
    Client
    Department of Defence
    Sector
    Defence
    Phase
    Deliver

    Australia–Singapore Military Training Initiative (ASMTI) – Greenvale Training Area (GVTA)

    PDM provided a project manager during the planning phase for the Greenvale Training Area (GVTA) under the Australia–Singapore Military Training Initiative.

    Read the project story

    Role: Project Manager

    Location: Greenvale

    Phase: Deliver

    PDM provided a project manager during the planning phase for the GVTA. Defence’s Managing Contractor, CPB Contractors Pty Ltd (CPB) are completing the design, with the final design of the GVTA expected in December 2022.

    To date, CPB has awarded in the order of $22.9 million of subcontractor work packages, with in the order of 95% of these awarded to local consultant companies. As part of the land development process for new Defence estate, Defence is required to undertake comprehensive environmental and heritage studies to manage the impact that development, and subsequent training, will have in these areas. Defence has completed detailed environmental studies for GVTA, to ensure that obligations under Australia’s Commonwealth Environment Protection and Biodiversity Conservation Act (Cth) 1999 continue to be met. Following completion of design and these land due diligence activities, negotiations were to commence with CPB for the construction of the facilities and infrastructure, and the release of major construction work packages.

  • Side-by-side views of the damaged earlier crossing and the deck of the new Inverdon Bridge
    Client
    Whitsunday Regional Council
    Sector
    Roads & Rail
    Phase
    Deliver

    Inverdon Bridge Reconstruction

    PDM assessed and prepared the QRA funding claim, engaged consultants, tendered the construction contract and managed it for a new 6-span concrete bridge across the Don River.

    Read the project story

    Role: Project Management

    Location: Don River

    Phase: Deliver

    Construction of a new concrete bridge, across the Don River, with 6 spans to cover the 120-metre crossing. Each span consisted of precast bridge decks, connected to cast in-situ head stocks connected to precast-driven concrete piles.

    This project required PDM to assess and prepare a funding claim through QRA to approve the scope and money for a new bridge. This involved the scope development and engagement of Geotechnical Consultants and Design Consultants and a Quantity Surveyor for the new structure. These engagements were to the Whitsunday Regional Council’s procurement process.

    Tender to open market for the construction contract and contract management through a second wet season.

  • A crane lowers a precast deck unit across the rock cutting, with the next unit waiting on a truck
    Client
    Townsville City Council
    Sector
    Roads & Rail
    Phase
    Deliver

    Victoria Street Bridge Replacement

    PDM coordinated the contractor’s designers, construction staff and management with Council’s technical, construction and commercial areas to ensure on-time delivery.

  • Excavator and crew excavating the pavement on Dalrymple Road beside an open traffic lane
    Client
    Townsville City Council
    Sector
    Roads & Rail
    Phase
    Deliver

    Dalrymple Road Pavement Rehabilitation and Reconstruction

    As Superintendent’s Representative, PDM managed multiple contractors and progress claims for the pavement rehabilitation and full reconstruction of Dalrymple Road.

    Read the project story

    Role: Superintendent’s Representative

    Location: Townsville

    Phase: Deliver

    PDM was engaged by Townsville City Council in the role of Superintendent’s Representative to complete a summary performance of the contracts required to undertake the construction of the pavement rehabilitation and full reconstruction of the pavement for Dalrymple Road.

    Throughout this project PDM liaised with Council and the Contractor, undertaking supervision of project issues to maintain a strong cooperative approach for the delivery of the project.

    The main challenge that manifested was the management of multiple contractors working on a highly trafficked road to allow delivery of the project within a very short timeframe.

    PDM also managed issue recommendations for monthly progress claims, for the approval of the Principal for payment under the terms of the applicable contracts.

  • New asphalt overlay on Pioneer Drive, with street trees along both verges
    Client
    Thuringowa City Council
    Sector
    Roads & Rail
    Phase
    Deliver

    Pioneer Drive

    As Council’s Representative, PDM undertook the contract administration and inspectorial services for the pavement rehabilitation and asphalt overlay of Pioneer Drive.

    Read the project story

    Role: Council’s Representative

    Location: Thuringowa

    Phase: Deliver

    PDM was engaged by Thuringowa City Council as Council’s Representative to undertake the Contract Administration and Inspectorial services for the pavement rehabilitation and asphalt overlay of Pioneer Drive.

    Challenges overcome during this project involved the management of multiple contractors all working within a short timeframe.

    Environmental management was also a key factor with the works, as there was a requirement from Council not to damage the existing trees lining the streetscape.

    All objectives were successfully achieved, with the pavement repair and rehabilitation delivered to Council within designated schedule and budget.

  • Sealed and line-marked car park with light poles at Jupiters Casino
    Client
    Matrix Group (Australia) Pty Ltd
    Sector
    Roads & Rail
    Phase
    Deliver

    Jupiter’s Casino Carpark

    PDM was Contracts Manager for the car park resurfacing and upgrade at Jupiters Casino, including an assessment of the pavement failures at the site.

    Read the project story

    Role: Contracts

    Location: Townsville

    Phase: Deliver

    PDM was engaged by Matrix Group (Australia) Pty Ltd as Contracts Manager in relation to the resurfacing and upgrade project for the car park at Jupiters Casino, Townsville, North Queensland.

    PDM was required to undertake an assessment of the pavement failures at the car park site and compile information for review by the Matrix Group and other associated parties.

    The scope of works involved the installation of new street lighting and access gates prior to the resurfacing of the existing car parking area.

    During the initial stages of the project PDM recommended the geotechnical investigation and design review of the existing car park pavement.

    The objective of this investigation and review was to highlight the soundness of the constructed pavement for the purposes of upgrading the pavement with the proposed works.

    This request was not acted upon by direction of the client.

  • Pavement rehabilitation plant working along a suburban street
    Client
    Townsville City Council
    Sector
    Roads & Rail
    Phase
    Deliver

    Pavement Rehabilitation 3 Year Program

    PDM provided Project Inspectors to inspect and control pavement rehabilitation works, including in-situ stabilisation, reconstruction and sealing, throughout Townsville.

    Read the project story

    Role: Inspectorial Services

    Location: Townsville

    Phase: Deliver

    As part of Townsville City Council’s pavement program, PDM has been engaged to undertake inspections for the upgrade and management of pavement rehabilitation works throughout Townsville and the surrounding area.

    PDM has provided Project Inspectors to undertake inspections and provide project control of works for the pavement rehabilitation program which involves in-situ stabilisation as well as pavement reconstruction and sealing.

    PDM inspectors actively manage Council’s programs and schedules to ensure works are completed to standard prior to seasonal wet weather activity.

    PDM has developed and maintained a strong working relationship with Council throughout this program and is providing continuity with experienced inspectors currently managing ongoing works.

  • Aerial view of the Townsville city centre and Castle Hill
    Client
    Townsville City Council
    Sector
    Advisory
    Phase
    Develop

    Facilities Master Plan

    PDM was Principal’s Representative for the development of a 50-year asset and infrastructure management plan for council administrative and front-line services.

    Read the project story

    Role: Principal’s Representative

    Location: Townsville

    Phase: Develop

    Development of a 50-year asset and infrastructure management plan for council administrative and front-line services (field personnel).

    This included a detailed analysis of council’s services and current depots to develop a proposal of short-term (5 years) and long-term (40 years) solutions to provide appropriate buildings and depots for its workforce and fleet.

    It was imperative to include financial limitations and reductions to ensure cost-saving developments for both council services and the community.

    The project involved assessing each building and depot for its utilisation and determining plant utilisation, establishing a long-term plan that would determine where people and plant would be located, the size of buildings / structure and their functions. Functional requirement briefs were developed for all new and retained buildings.

  • Aerial view of ships at berth in the Port of Townsville, with Castle Hill behind
    Client
    Townsville Port Authority
    Sector
    Advisory
    Phase
    Develop

    Major Projects Development

    PDM prepared a report for the Townsville Port Authority Board summarising the status, background and justification of six major capital projects for the financial year 2008.

    Read the project story

    Role: Project Feasibility Business Case

    Location: Port of Townsville

    Phase: Develop

    PDM was engaged by the Townsville Port Authority to prepare a report for their Board which would summarise the key points pertaining to six major capital projects for the financial year 2008.

    This report was commissioned to summarise the status and background of the major projects programmed for 2008 to be undertaken by the Townsville Port Authority for the Port of Townsville.

    The report focussed on the justification of six major projects for the financial year 2008. There had previously been no financial analysis prepared for this justification, and the report PDM prepared was a high-level review of the port’s operational requirements based on a desktop review of the 2007 Master Plan and Business Cases of the Townsville Port Facility.

    The report detailed purpose, benefits, current status and supporting data/actions, as well as identifying any financial risks associated with an operation of this volume.

    PDM was requested to articulate the different project management delivery models for a major project, defining some of the risk associated with each model.

  • Aerial view of the Port of Townsville wharves, with the city and Castle Hill behind
    Client
    Department of Infrastructure, Local Government and Planning (DILGIP)
    Sector
    Advisory
    Phase
    Develop

    Maturing the Infrastructure Pipeline – Strategic Construction Planning

    PDM’s strategic review covered the overall project to expand port capacity by dredging the channels wider and deeper, reclaiming land and building deeper, longer berthing.

    Read the project story

    Role: Strategic review

    Location: Port of Townsville

    Phase: Develop

    Port of Townsville is the largest general cargo and supply port in Northern Australia. While it exports mainly mining and agriculture products, it is North Queensland’s main import destination for fuel, bitumen, mining supplies for the Northwest Mineral Province, Galilee and Bowen Basin.

    The catchment for Port of Townsville includes Central, North, North-West and Far North Queensland. It supplies 700,000 people in this region with containerised consumer goods as well as motor vehicles.

    Townsville Port is unable to accommodate increasingly larger vessels due to channel width limitations, resulting in freight for Northern Queensland having to utilise capital city ports and then road / rail transport between Brisbane and Townsville.

    Over the past decade, larger container vessels (Panamax and Post Panamax) have entered the east coast of Australia and have had to bypass Townsville due to their size. Global shipping trend analysis demonstrates that increased vessel sizes will be utilised in Australia, meaning more vessels will avoid Townsville and utilise capital city ports.

    The bypassing of Townsville by larger vessels also directly affects the cost of living for residents in the North as well as the cost of manufacturing and other costs to industries in North Queensland.

    Disaster resilience and storage capabilities are an issue for the North. Without land reclamation and subsequent stages of the Port Expansion, Townsville will be vulnerable to supply chain failure in the event of natural disasters.

    This project involved the strategic review of the overall project to expand port capacity by:

    • Dredging the port channels wider and deeper
    • Reclaiming land
    • Building deeper and longer berthing
  • Palms, lawn and garden beds in Queens Gardens, Townsville
    Client
    Townsville City Council
    Sector
    Advisory
    Phase
    Develop

    Review of Contract Documents, Parks Department

    PDM reviewed the Parks Department’s new suite of contract documents, providing information to be incorporated into Council’s Legal Department documents.

    Read the project story

    Role: Contract Management

    Location: Townsville

    Phase: Develop

    As part of the newly combined Council, Townsville City Council Combined Parks Division contracted PDM to review the new suite of contract documents which had recently been introduced to the Parks Department under the “fit for use” purpose.

    A number of outcomes resulted from this review, which provided the Parks Department information to be incorporated into Council’s Legal Department documents, such that these could be streamlined; thus, better protecting Council when engaging small to medium contractors.

    The review identified that Council needed to alter its policy in terms of public liability and professional indemnity to cater for the various types of contracts which range in price and scope to enable the small to medium enterprises (SMEs) to provide service to Council.

    This document is now the standard template for all works within the Parks Department.

  • Sheds and a sealed hardstand behind temporary fencing at the Herveys Range Front resource recovery facility
    Client
    Townsville City Council
    Sector
    Energy & Resources
    Phase
    Deliver

    Herveys Range Front Resource Recovery Facility

    Following handover from the initial Project Manager, PDM provided project management, inspector and superintendent’s representative services to administer the entire project.

    Read the project story

    Role: Superintendent’s Representative and Inspectorial Services

    Location: Herveys Range

    Phase: Deliver

    PDM utilised the PMBOK methodologies to deliver this project. It required a stepped approach to ensure all of scope was captured and addressed and included all stakeholders.

    This is Council’s first sale and recycle waste station developed at this site and required close liaison with council as to permits and licences.

    The project provides for the entire sale and recycle of waste. The facility is fully enclosed and contains all waste for the safe and efficient sorting and transfer to council facilities at other locations via truck.

    PDM provided Council with project management, inspector, and superintendent’s representative to administer the entire project, following handover from the initial Project Manager.

    PDM’s scope included:

    • Approvals process for all agencies
    • Managing design changes and scope clarification completed by Council
    • Managing changes to the contract after initial contract dispute between the council and builder
    • Construction phase services of superintendent and inspector to deliver and complete project
    • Manage defects liability period
  • Bulk earthworks for the new waste cell at the Jensen Waste Facility, with plant working in the distance
    Client
    Townsville City Council
    Sector
    Energy & Resources
    Phase
    Deliver

    Jensen Cell Development – Waste Management

    PDM undertook the construction management of a new waste cell approximately 1.5 hectares in size, part of Council’s Master Plan for the Jensen Waste Facility.

    Read the project story

    Role: Project and Construction Management

    Location: Jensen, Townsville

    Phase: Deliver

    PDM undertook the construction management of a new waste cell approximately 1.5 hectares in size. This was part of Townsville City Council’s Master Plan for the Jensen Waste Facility.

    One of the main challenges with this project was monitoring environmental management on behalf of Council to ensure the earthworks were carried out in accordance with industry best practice and compliance with the Environmental Protection Agency (EPA) licence requirements.

    Dust and sediment runoff control were key issues with an earthworks project of this scale.

    The works involved the planning and development of a bulk earthworks project in excess of 30,000m³, inclusive of seepage drainage for the waste cell.

  • Collage of Whitsunday buildings, including the Whitsunday Coast Airport terminal and Bowen PCYC
    Client
    Whitsunday Regional Council
    Sector
    Buildings
    Phase
    Deliver

    Whitsunday Buildings – Tropical Cyclone Debbie

    PDM project managed the review and assessment of all buildings and facilities affected by Cyclone Debbie, providing scopes of damage and engaging builders for repairs.

    Read the project story

    Role: Project Management

    Location: Whitsunday region

    Phase: Deliver

    PDM undertook the project management of reviewing and assessing all buildings and facilities affected by Cyclone Debbie.

    Working with Whitsunday Regional Council insurers to provide scopes of damage, received agreements from insurers and engage builders to repair a range of buildings and facilities, including:

    • Whitsunday Airport Building
    • Bowen PCYC
    • Airlie Beach PCYC
    • Proserpine Council Building
    • Proserpine Entertainment Centre
    • All parks across Whitsunday region
  • The extended Townsville Civic Theatre building
    Client
    Townsville City Council
    Sector
    Buildings
    Phase
    Deliver

    Civic Theatre Extension

    PDM’s Project Inspector carried out Council inspections and approved the standard of workmanship for the multi-million-dollar redevelopment of Townsville’s Civic Centre.

    Read the project story

    Role: Project Management

    Location: Townsville

    Phase: Deliver

    PDM’s Project Inspector was responsible for Council inspections and to approve the standard of workmanship for the multi-million-dollar redevelopment of Townsville’s Civic Centre.

    This project involved the regular risk-based assessment to control the works that were being conducted on site and ability to analyse the vertical built form of the new structure.

    PDM’s inspector was also actively involved with identifying any defects and instigating communication with the client and contractors to rectify any issues.

    Completion of this multi-million-dollar project sees Townsville with a state-of-the-art venue for theatre and performance arts, offering economic and social benefits to the wider community.

  • The Warhaven Home building in Cairns, with its RSL Far North District Branch sign
    Client
    Returned Services League Queensland (RSL – Qld)
    Sector
    Buildings
    Phase
    Deliver

    Warhaven Retirement Village – Manager’s Residence Refurbishment

    PDM’s Principal Project Manager managed refurbishment works at the Warhaven Retirement Village in Cairns, including a complete renovation of the on-site Manager’s residence.

    Read the project story

    Role: Project Management

    Location: Cairns

    Phase: Deliver

    PDM’s Principal Project Manager, after consultation with key representatives of the RSL State Branch, managed the refurbishment works for the Warhaven Retirement Village in Cairns, including a complete renovation of the on-site Manager’s residence.

    A key issue with this project was consideration of, and minimal disturbance to, the elderly and infirm residents.

    Whilst the project involved PDM managing the building contractor to ensure the Scope of Works was achieved within the client’s schedule and budget, it also reflected a firm emphasis on community values, showing residents.

  • Gravel driveway and carports at the Emu Park Retirement Village
    Client
    Returned Services League Queensland (RSL – Qld)
    Sector
    Buildings
    Phase
    Deliver

    Emu Park Retirement Village – Refurbishment

    PDM was engaged to inspect and undertake the project management for the demolition and refurbishment works at RSL Queensland’s Emu Park Retirement Village.

    Read the project story

    Role: Project Management

    Location: Emu Park

    Phase: Deliver

    PDM has been engaged to inspect and undertake the Project Management for the demolition and refurbishment works at RSL Queensland’s Emu Park Retirement Village.

    PDM’s Principal Project Manager conducted a site inspection of the residence with key representatives from RSL Queensland to ascertain the condition of the Retirement Village.

    From this process a determination was made to invite a number of competent building contractors from the Rockhampton area to tender for renovation works following a comprehensive site inspection.

    PDM has closely monitored the tender process and in conjunction with RSL has identified and engaged the most suitable contractor for these works based upon qualifications and budgetary requirements.

  • Street frontage of Tobruk House in Rockhampton
    Client
    Returned Services League Queensland (RSL – Qld)
    Sector
    Buildings
    Phase
    Deliver

    ANZAC House and Tobruk House

    PDM planned the renovation, reconfiguration and reallocation of office space within the heritage buildings of Anzac and Tobruk House in Rockhampton for RSL Queensland.

    Read the project story

    Role: Project Management

    Location: Rockhampton

    Phase: Deliver

    PDM has been engaged by RSL Queensland to undertake plans for the renovation, reconfiguration, and reallocation of office space within the heritage buildings of Anzac and Tobruk House, in Rockhampton with the goal of better utilisation of these premises.

    The brief for this project is to deliver two quality buildings in a centralised location that offer a series of well-appointed office suites.

    Ideally, PDM has worked closely with RSL Queensland throughout the process and planning stages of this renovation project, organising it over four phases to determine the quality of works. PDM has been able to identify and necessitate upgrades where necessary to maintain the life of the asset, whilst working within RSL’s budgetary requirements.

    An essential requirement of this project is to ensure minimum disruption and displacement to existing tenants, whilst allowing upkeep and maintenance of two valuable and iconic RSL assets.

  • The RSL Memorial Hall and cenotaph in Collinsville, above a concept sketch of the proposed memorial park
    Client
    Returned Services League Queensland (RSL – Qld)
    Sector
    Buildings
    Phase
    Deliver

    Collinsville Memorial Park

    PDM reported on the condition of the RSL Memorial Hall in Collinsville, recommended a Memorial Park on the land and managed the Architectural Design Team.

    Read the project story

    Role: Project Management

    Location: Collinsville

    Phase: Deliver

    RSL Queensland engaged PDM to undertake an inspection and provide a report on the condition of the RSL Memorial Hall located in Collinsville, in central Queensland.

    Due to the dilapidated condition of this building, PDM made the recommendation to the RSL that a Memorial Park be erected on the land, utilising the existing cenotaph at its heart as a point of reflection, and maintaining a link with the values of this close-knit community.

    The planning phase determined that PDM initiate the groundwork and manage the Architectural Design Team, whilst maintaining full communication with RSL Queensland throughout every stage of the process.

    It also required more detailed concept costs to enable a budget to be included in the business for capital expenditure whilst meeting the client’s expectations.

  • Flood damage on Burdekin Road: a rutted, scoured gravel surface
    Client
    Charters Towers Regional Council
    Sector
    Disaster Management
    Phase
    Deliver

    CTRC 2021 Disaster Recovery Funding Arrangements (DRFA)

    PDM provided program management for CTRC’s DRFA works, which involved assessing 3,850km of shire roads and reconstructing approximately 1,300km of road.

  • Storm-damaged pontoon and seawall at Shute Harbour in rough seas
    Client
    Whitsunday Regional Council
    Sector
    Disaster Management
    Phase
    Deliver

    Shute Harbour Redevelopment

    PDM provided the project management team to scope and manage the design and construction phases for the reconstruction of the Shute Harbour precinct.

    Read the project story

    Role: Project management

    Location: Shute Harbour

    Phase: Deliver

    Shute Harbour was originally constructed in the early 1960s as an ideal location for a departure point to service local island and reef trips due to its central proximity to nearby tourist attractions. Further infrastructure improvements were completed in both the 1970s and again in the late 1990s / early 2000s.

    PDM provided the project management team to scope, manage design, and construction phases for the reconstruction of the Shute Harbour precinct. The project objective was to re-establish the commercial functionality without restricting the ability to future-proof the requirements of the site.

    The reconstruction of Shute Harbour includes a sea wall, carpark, fuel facilities, a harbour terminal building, six floating pontoons that create 3 finger pontoons.

  • Aerial view of waves washing over the Bowen foreshore beside a row of cabins and palm trees
    Client
    Whitsunday Regional Council
    Sector
    Disaster Management
    Phase
    Deliver

    Bowen Front Beach Restoration

    After the 2017 Cyclone Debbie, PDM managed the assessment of damage and claim preparation, design management, tender and construction management to handover.

    Read the project story

    Role: Project Management

    Location: Bowen

    Phase: Deliver

    Bowen’s front beach suffered extreme damage in the 2017 Cyclone Debbie, amounting to loss of beach material and beach retaining wall for approximately 230 metres.

    The project involved the assessment of damage and claim preparation, design management, tender and construction management to handover. The construction of new wall was a plastic pile and concrete cast in-situ footings, with precast stepped decking.

    Solar lighting on powder-coated columns for full length of new wall.

  • Aerial view of floodwater through houses and streets
    Client
    Hinchinbrook Shire Council
    Sector
    Disaster Management
    Phase
    Operate

    NDRRA Flood Assessments of Infrastructure and Roads

    PDM provided engineers and inspectors to validate and quantify flood damage to road pavements and infrastructure after the 2010/2011 flood events, and to estimate costs.

    Read the project story

    Role: Inspectorial Services

    Location: Ingham

    Phase: Operate

    PDM was engaged to provide Engineers and Inspectors for the 2010/2011 flood events to conduct risk-based assessment and analysis of civil projects for the Hinchinbrook Shire Council, in Ingham and surrounding localities.

    This involves undertaking site inspections for the initial validation and quantification of flood damages to road pavements and infrastructure, and to prepare estimates for Council in relation to costs of works.

    PDM inspectors actively manage Council’s programs and schedules to ensure works are completed to standard prior to seasonal wet weather activity.

    PDM has developed and maintained a strong working relationship with Council throughout this program.

  • Flood damage on an unsealed road: rutted gravel and wheel tracks
    Client
    Whitsunday Regional Council
    Sector
    Disaster Management
    Phase
    Deliver

    Whitsunday Regional Council – DRFA

    As Council’s program management consultant, PDM oversaw the implementation of NDRRA/DRFA flood and cyclone damage remediation works for Whitsunday Regional Council.

Talk to the team about your project.

Call the Hermit Park office, email the team or send an enquiry. Accreditation and policies are on the About page.

Phone07 4772 0402pdm@pdmanagers.com.au

Level 1, 134 Charters Towers Road, Hermit Park QLD 4812

Send an enquiry